人人91人人澡人人妻人人爽 ,精品无码日韩国产不卡av,中文字幕免费在线视频,国产又粗又猛又爽视频,福利在线免费视频,日韩欧美91,丰满人妻久久中文字幕,日韩精品无码不卡无码
EN | 中文
Export Sales
Contact Us
Korea, Japan, India, Pakistan, Nepal, Bangladesh, Sri Lanka, Singapore, Malaysia, Thailand, Mongolia
  • WechatWhatsApp
    Ashley Quan

    Cell : +86 139 10174313Tel: +86 10 89411982Fax: +86 10 89411980Email: asia@hjglass.com.cn

South America, Australia, North America, Philippines, Myanmar, Indonesia, Cambodia, Vietnam
  • WechatWhatsApp
    Julie Wu

    Cell : +86 138 26203956Tel: +86 10 89411982Fax: +86 10 89411980Email: am-aus@hjglass.com.cn

Middle East, Europe, Africa
  • WechatWhatsApp
    Sami Zhang

    Cell : +86 138 10073939Tel: +86 10 89411982Fax: +86 10 89411980Email: sales@hjglass.com.cn

After-Sale Service
  • China Domestic Office Liu Lin

    Tel: 010-89411972 / 73
    Fax: 010-89411975
    Email: service@hjglass.com.cn

  • Export Department Amy Guan

    Tel: +86 10-89411982
    Fax: +86 10-89411980
    Email: hhj@hjglass.com.cn

    WhatsApp Wechat
Common Problem
  • QRoutine Maintenance for Press Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Washing Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Spacer Bending Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Desiccant Filling Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Clean the butyl glue that may remain on the surface of structures related to glue supply and blocking every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a week (especially the molecular sieve dust attached to the exposed shaft rod of the cylinder)
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Butyl Extruder

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Check whether the circuit and air circuit plug connections are firmly connected once a week
    4. Check whether the bolts of moving parts are loose and fall off once a week
    5. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    6. Clean up the butyl rubber that may remain in the rubber nozzle, conveyor belt, auxiliary pressure roller and other structural parts in time
    7. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QPLC

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    2. Check the connection of I / O modules every week to ensure that all sockets, terminal boards and modules are well connected and firmly placed. When the environment of PLC control system is often subject to vibration that makes the terminal connection loose, this inspection should be carried out frequently;
    3. Check the PLC battery every week: the random access memory (RAM), counter and auxiliary relay with holding function stored in the PLC are protected by lithium battery. The service life of lithium battery is about 5 years. When the voltage of lithium battery gradually decreases to a certain extent, the battery voltage reduction indicator on the PLC basic unit is on. Remind the user that the program supported by lithium battery can be retained for about a week, and the battery must be replaced.
    For example, there is a "bat" red LED indicator on the CPU module of the PLC. When this led is on, it indicates that the service life of the lithium battery in the PLC is almost over (it can last about one week at most). At this time, please replace the new lithium battery as soon as possible to avoid the automatic disappearance of the program in the PLC (when ram is used).

    +-
  • QElectric Machinery

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust and oil sludge outside the motor base shall be removed in time.
    2. Check whether the motor operates normally every week without abnormal noise and heating.
    3. Check whether the wiring screws of the junction box are loose and burned every week.
    4. Weekly insulation inspection. During the use of the motor, the insulation resistance shall be checked frequently, and attention shall be paid to check whether the grounding of the motor shell is reliable.
    5. For the maintenance and repair of the motor cooling fan every week, the dust or foreign matters on the cooling fan shall be cleaned in time to prevent the abnormal temperature rise of the motor caused by the abnormal operation of the fan.

    +-
  • QEncoder

    ACheck whether the encoder signal is normal and whether the encoder coupling is loose every week. If it is loose, replace the coupling in time or replace the encoder. If the encoder signal fails, the inflatable partition will collide with the glass and damage the partition.

    +-
  • QTravel Switch

    ACheck whether the signals of all travel switches are normal every week. The travel switch is used for mechanical travel limit or zero positioning, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.

    +-
  • QSensor

    A1. Check whether the signals of all sensors are normal every week, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.
    2. Dust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.
    3. Check whether the fastening nuts of all sensors and the fasteners of sensor support are loose every week. If there are problems, adjust and retighten them in time.

    +-
  • QTouch Screen

    ADust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.

    +-
  • QCheck the Power Supply Voltage Regularly

    ACheck the power supply voltage every week;
    3P 380V / 1p + n 220V, according to national regulations, its fluctuation range is ≤ 10%.
    24V power supply, fluctuation amplitude ≤ 5%

    +-
  • QLow Voltage Electrical Parts Of Control Cabinet

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.

    +-
  • QFrequency Converter, Servo Driver

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    The parameters of frequency converter and servo driver have been set before leaving the factory. Do not change the parameters of frequency converter without authorization, otherwise the equipment will not operate normally.

    +-
  • Online Message

  • +86 10 89411982
  • 主站蜘蛛池模板: 999国内精品久久免费视频| 久久精品国产精品一区二区| 精品一区国产精品| 嫩草在线视频| 亚洲中文字幕无码爆乳| 中文字幕在线观| 蜜桃视频一区| 在线国产欧美| 婷婷99视频精品全部在线观看| 中文一区二区视频| 亚洲欧美日韩成人在线| 欧美天堂久久| 在线观看网站国产| 蜜桃臀无码内射一区二区三区| 亚洲免费福利视频| 亚洲天堂高清| 玖玖免费视频在线观看| 国产精品视频观看裸模| 亚洲日本www| 午夜久久影院| 久久免费精品琪琪| 日本www在线视频| 亚洲视频一区在线| 亚洲区视频在线观看| 精品无码视频在线观看| 精品视频一区二区三区在线播| 亚洲一区毛片| 黄色国产在线| 国产精品99r8在线观看| 亚洲国产成人在线| 中文国产成人精品久久| 久操中文在线| 一本大道香蕉中文日本不卡高清二区 | 任我操在线视频| 欧美日韩成人| 伊人丁香五月天久久综合| 国产精品毛片一区视频播 | 午夜国产精品视频黄| 色综合久久无码网| 国产导航在线| 日韩在线成年视频人网站观看| 国产丝袜无码精品| 麻豆精选在线| 四虎永久在线精品影院| 色偷偷一区二区三区| 狼友av永久网站免费观看| 在线亚洲小视频| 国产精品美女免费视频大全| 丰满人妻一区二区三区视频| 美女无遮挡免费视频网站| 国产精品香蕉在线观看不卡| 99青青青精品视频在线| 精品综合久久久久久97| 久久黄色影院| 久久精品日日躁夜夜躁欧美| 国产视频入口| 色妞永久免费视频| 亚洲一级毛片在线播放| 久久精品国产亚洲麻豆| jijzzizz老师出水喷水喷出| 中文字幕永久在线看| 美女毛片在线| 亚洲国产成人精品一二区| av一区二区三区高清久久| 2021国产在线视频| 999国内精品视频免费| 中美日韩在线网免费毛片视频| 激情综合网址| 亚洲女同一区二区| 久久免费视频6| 国产高清精品在线91| 动漫精品中文字幕无码| 99久久婷婷国产综合精| 欧美一区二区自偷自拍视频| 亚洲天堂777| 国产无码精品在线| 午夜a级毛片| 欧美中文字幕在线播放| 精品人妻AV区| 亚洲高清中文字幕在线看不卡| 欧美一级片在线| 亚洲综合片|