人人91人人澡人人妻人人爽 ,精品无码日韩国产不卡av,中文字幕免费在线视频,国产又粗又猛又爽视频,福利在线免费视频,日韩欧美91,丰满人妻久久中文字幕,日韩精品无码不卡无码
EN | 中文
Export Sales
Contact Us
Korea, Japan, India, Pakistan, Nepal, Bangladesh, Sri Lanka, Singapore, Malaysia, Thailand, Mongolia
  • WechatWhatsApp
    Ashley Quan

    Cell : +86 139 10174313Tel: +86 10 89411982Fax: +86 10 89411980Email: asia@hjglass.com.cn

South America, Australia, North America, Philippines, Myanmar, Indonesia, Cambodia, Vietnam
  • WechatWhatsApp
    Julie Wu

    Cell : +86 138 26203956Tel: +86 10 89411982Fax: +86 10 89411980Email: am-aus@hjglass.com.cn

Middle East, Europe, Africa
  • WechatWhatsApp
    Sami Zhang

    Cell : +86 138 10073939Tel: +86 10 89411982Fax: +86 10 89411980Email: sales@hjglass.com.cn

After-Sale Service
  • China Domestic Office Liu Lin

    Tel: 010-89411972 / 73
    Fax: 010-89411975
    Email: service@hjglass.com.cn

  • Export Department Amy Guan

    Tel: +86 10-89411982
    Fax: +86 10-89411980
    Email: hhj@hjglass.com.cn

    WhatsApp Wechat
Common Problem
  • QRoutine Maintenance for Press Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Washing Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Spacer Bending Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Desiccant Filling Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Clean the butyl glue that may remain on the surface of structures related to glue supply and blocking every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a week (especially the molecular sieve dust attached to the exposed shaft rod of the cylinder)
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Butyl Extruder

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Check whether the circuit and air circuit plug connections are firmly connected once a week
    4. Check whether the bolts of moving parts are loose and fall off once a week
    5. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    6. Clean up the butyl rubber that may remain in the rubber nozzle, conveyor belt, auxiliary pressure roller and other structural parts in time
    7. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QPLC

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    2. Check the connection of I / O modules every week to ensure that all sockets, terminal boards and modules are well connected and firmly placed. When the environment of PLC control system is often subject to vibration that makes the terminal connection loose, this inspection should be carried out frequently;
    3. Check the PLC battery every week: the random access memory (RAM), counter and auxiliary relay with holding function stored in the PLC are protected by lithium battery. The service life of lithium battery is about 5 years. When the voltage of lithium battery gradually decreases to a certain extent, the battery voltage reduction indicator on the PLC basic unit is on. Remind the user that the program supported by lithium battery can be retained for about a week, and the battery must be replaced.
    For example, there is a "bat" red LED indicator on the CPU module of the PLC. When this led is on, it indicates that the service life of the lithium battery in the PLC is almost over (it can last about one week at most). At this time, please replace the new lithium battery as soon as possible to avoid the automatic disappearance of the program in the PLC (when ram is used).

    +-
  • QElectric Machinery

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust and oil sludge outside the motor base shall be removed in time.
    2. Check whether the motor operates normally every week without abnormal noise and heating.
    3. Check whether the wiring screws of the junction box are loose and burned every week.
    4. Weekly insulation inspection. During the use of the motor, the insulation resistance shall be checked frequently, and attention shall be paid to check whether the grounding of the motor shell is reliable.
    5. For the maintenance and repair of the motor cooling fan every week, the dust or foreign matters on the cooling fan shall be cleaned in time to prevent the abnormal temperature rise of the motor caused by the abnormal operation of the fan.

    +-
  • QEncoder

    ACheck whether the encoder signal is normal and whether the encoder coupling is loose every week. If it is loose, replace the coupling in time or replace the encoder. If the encoder signal fails, the inflatable partition will collide with the glass and damage the partition.

    +-
  • QTravel Switch

    ACheck whether the signals of all travel switches are normal every week. The travel switch is used for mechanical travel limit or zero positioning, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.

    +-
  • QSensor

    A1. Check whether the signals of all sensors are normal every week, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.
    2. Dust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.
    3. Check whether the fastening nuts of all sensors and the fasteners of sensor support are loose every week. If there are problems, adjust and retighten them in time.

    +-
  • QTouch Screen

    ADust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.

    +-
  • QCheck the Power Supply Voltage Regularly

    ACheck the power supply voltage every week;
    3P 380V / 1p + n 220V, according to national regulations, its fluctuation range is ≤ 10%.
    24V power supply, fluctuation amplitude ≤ 5%

    +-
  • QLow Voltage Electrical Parts Of Control Cabinet

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.

    +-
  • QFrequency Converter, Servo Driver

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    The parameters of frequency converter and servo driver have been set before leaving the factory. Do not change the parameters of frequency converter without authorization, otherwise the equipment will not operate normally.

    +-
  • Online Message

  • +86 10 89411982
  • 主站蜘蛛池模板: 亚洲侵犯无码网址在线观看| 国产欧美在线观看一区| 亚洲综合经典在线一区二区| 国产精选小视频在线观看| 综合天天色| 成人中文字幕在线| 精品视频一区二区三区在线播| 亚洲欧洲AV一区二区三区| 中文字幕波多野不卡一区| 久久久久夜色精品波多野结衣| 成人一区专区在线观看| 91口爆吞精国产对白第三集| 午夜少妇精品视频小电影| 国内丰满少妇猛烈精品播 | 伊人精品成人久久综合| 国产福利拍拍拍| WWW丫丫国产成人精品| 国产激情在线视频| 无码精油按摩潮喷在线播放| 久久一级电影| 一区二区三区国产| 国产一二三区视频| 性网站在线观看| 手机永久AV在线播放| 无码内射中文字幕岛国片| 国产裸舞福利在线视频合集| 日本一区高清| 久久无码av一区二区三区| 国产chinese男男gay视频网| 特级毛片免费视频| 免费又黄又爽又猛大片午夜| 88av在线播放| 成人va亚洲va欧美天堂| 国产国产人成免费视频77777| 国内精品久久久久久久久久影视| 国产精品福利社| 国产高清毛片| 在线观看国产黄色| yjizz视频最新网站在线| www.亚洲色图.com| 国产精品成人一区二区不卡| 麻豆精品在线播放| 国产精品欧美日本韩免费一区二区三区不卡 | 日韩少妇激情一区二区| 91成人在线观看视频| 日韩精品一区二区三区中文无码| 在线观看无码av五月花| 尤物成AV人片在线观看| 亚洲人成网站色7799在线播放| 777国产精品永久免费观看| 国产乱子伦无码精品小说| 欧美福利在线| 午夜一区二区三区| 精品久久久无码专区中文字幕| 91福利免费视频| 免费大黄网站在线观看| 专干老肥熟女视频网站| 九色91在线视频| 日韩精品亚洲人旧成在线| 亚洲男人的天堂在线观看| 亚洲国产系列| 国产一级二级三级毛片| 99久久亚洲精品影院| 国产美女无遮挡免费视频| 好吊色妇女免费视频免费| 久久情精品国产品免费| 亚洲精品无码AV电影在线播放| 亚洲首页国产精品丝袜| 一区二区自拍| 午夜爽爽视频| 国产jizz| 欧美a在线| 久久久久亚洲精品成人网| 美女被躁出白浆视频播放| 在线观看视频99| 国产另类乱子伦精品免费女| 日韩无码真实干出血视频| 老司机午夜精品网站在线观看| 亚洲美女久久| 国产情侣一区二区三区| 亚洲欧美日本国产综合在线| 欧美精品H在线播放|